Mark the gutter slope.
Attaching gutters to fascia.
These straps act as a sling for your gutter.
Fascia boards go around the eaves of your home s roof and are typically where the gutters are attached.
These should be attached through fascia into rafter tails rather than to just the fascia for a secure and long lasting.
If a gutter run will measure longer than 40 feet 12 m the gutter should be positioned to pitch down from the middle aimed toward a downspout at each end.
If you need to put fascia boards on your home there are easy ways to ensure that they fit correctly and are installed properly.
Attaching gutters to the fascia boards.
Gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
If you have an.
When installing gutters set the proper slope by driving a nail 1 2 in.
Below the shingles on the high side of the gutter run.
Once you measure your roof to determine what length you need cut the boards to the correct size.
Apply gutter sealant to an end cap then press the cap onto one end of the gutter.
However every rainwater system has its own manufacturer s specification for how far apart the fixings should be.
Sometimes the roof needs repair in addition to the gutters but you aren t able to complete both projects at the same time.
Measure and record the distance from the bottom of the fascia board to this nail.
Before punching in the screw check the alignment and assure it is going along with the marked position.
These are currently the most popular alternatives for installing gutters in properties without a fascia board.
Side rafter brackets are galvanized metal arms which are fixed to the bottom side of your rafters.
Secure the end cap to the gutter with a crimping tool.
A standard fascia bracket will then be used to connect the rafter s front plate arm with a provided bolt and nut.
They re fitted to the gutter hanger and then they are attached directly to the roof.
After fixing the fascia boards in place the next step is attaching the gutters to them.
Snap a chalk line across the fascia creating the proper pitch toward the downspout end.
Punch in the 1 hex head screw using the electric drill at the distance of every 2 foot along with the gutter runner.
To do this fixings that carry the guttering must be fitted to the facias.
Installing gutters in 18 steps.
Measure the fascia to determine the length of the gutter.
Attach the gutter to fascia by fastening the screw from the backside of it to the rain spout.